Enclave at Depot Park is a new 78 unit Senior Living (55+) apartment community that received its EarthCraft Multifamily certification in February 2021. It is located at 2726 S Main St in Kennesaw, Georgia. This property is a mixed use property with both commercial and residential uses. Tenants began moving into the first building in the late summer of 2020.
Leasing Information
For leasing or other information, please call 678-384-2899. You can also visit their web site at: Enclave at Depot Park
Enclave at Depot Park is centrally located in Kennesaw with many community services and opportunities within a short walking or driving distance. These include medical services, banking, shopping, dining, varied professional services, places of worship, and city government services.
Each apartment will offer the following amenities:
Resident friendly layouts designed for both comfort and attractive entertainment of friends and family
Energy efficient appliances.
Energy efficient heating and cooling systems.
Washer and dryer hookups
ENERGY STAR® ceiling fans.
Along with the amenities offered in each apartment, the community will offer:
A community center with computer library
Fitness enter
Picnic Pavilion
Furnished community room
The photo gallery below will show some of the beauty of Enclave at Depot Park. The gallery will grow with each inspection covering from start to finish.
Synergy Custom Services' only role at Enclave at Depot Park is to provide EarthCraft Technical Advisory, inspection, and testing services. We have no other role in this project.
Enclave at Depot Park Photo Gallery
For a larger photo and a brief description, please click or tap a photo.
Enclave at Depot Park 01
Enclave at Depot Park is currently seeking the EarthCraft Multifamily certification.
Enclave at Depot Park 02
This is an exterior view of the main community center entry as it is working toward being dried in.
Enclave at Depot Park 03
This residential building is having windows and patio/balcony doors moved into place for installation.
Enclave at Depot Park 04
This is how buildings looked during the framing process.
Enclave at Depot Park 05
Duct work for the heat pump systems is being installed.
Enclave at Depot Park 06
Radiant barriers were installed in the attic. This will help reduce heat buildup in the attic areas.
Enclave at Depot Park 07
This worker is installing the fire sprinkler system.
Enclave at Depot Park 08
The installation of stairs serves multiple purposes on a construction site. Two of the best are: 1) safety if the property needs to be evacuated, and 2) improved access to move workers and materials into place for construction.
Enclave at Depot Park 09
The insulation in the first building was installed just before the end of January. Soon sheetrock will be ready to cover it.
Enclave at Depot Park 10
This is the front of the building that will serve as the community center.
Enclave at Depot Park 11
This shows brick masons hard at work on the second level.
Enclave at Depot Park 12
This is a view of the interior framing.
Enclave at Depot Park 13
This is the window efficiency sticker indicating that it meets two important standards: It is ENERGY STAR qualified and it is highly efficiency.
Enclave at Depot Park 14
Each of the three buildings at Enclave at Depot Park have multiple Radon vents to provide safety to all residents from any dangerous soil gasses.
Enclave at Depot Park 15
Everything is set up and ready to run the rough-in duct test.
Enclave at Depot Park 16
This is the test result of the duct test for a 2-bedroom unit in Building A. This translates to less than 2% duct leakage (very tight duct system).
Enclave at Depot Park 17
This is s living room view from the kitchen area after sheet rock has been installed.
Enclave at Depot Park 18
This is a kitchen area. The blue sheetrock is moisture resistent sheetrock to help avoid damage from water leaks, mold, or mildew.
Enclave at Depot Park 19
Exterior View from the street
Enclave at Depot Park 20
Exterior View from the parking lot side
Enclave at Depot Park 21
As preparation for the future that is almost now, Enclave at Depot Park has an electric car charging station installed.